SolarPermitPrepAI
Check a residential solar permit packet before quoting plan-set work.
Organize AHJ, roof, equipment, service-panel, and document details into a practical intake summary, missing-item list, and CAD handoff brief.
AHJ packet
Site plan, SLD inputs, labels, cut sheets, utility notes.Free precheck first
Check packet fit before paying for the $49 review.
Use the browser-local precheck to see whether the address, AHJ, equipment, and document list are ready for a cleaner qualified handoff.
Browser-generated paid handoff
Activate the $49 review pack and download a deeper permit packet handoff.
The paid pack adds document ownership, field-verification, professional-review, and submission-gate checklists. Activation sends only the code and product key; project notes stay in this browser.
Enter a valid code to unlock the paid handoff.
After payment, enter the SP- activation code above. Need a code? Generate a ready precheck before buying. If checkout is unavailable after fit, use the PayPal fallback, then open support with the receipt.
Generated pack
Permit packet precheck
Missing items
CAD handoff brief
Quote email
Permit prep guides
Shortcuts for the details that usually delay plan-set intake.
Buy only when the packet is ready
Use the paid review when the free precheck gives a qualified reviewer something specific to verify.
SolarPermitPrepAI is for organizing project facts and missing documents before a professional handoff. The installer, drafter, engineer, AHJ, utility, and authorized submitter remain responsible for technical and official decisions. This is intake and quote prep, not an engineering stamp.
Good fit for the $49 review
- You have an address, AHJ, project scope, equipment notes, and a first document list.
- You need missing-item, document-owner, field-verification, and reviewer-question structure.
- A qualified contractor, drafter, electrician, engineer, or permit professional will make the final decisions.
Keep the official steps separate
- Use the packet to prepare a cleaner handoff for plan-set quoting, correction review, or utility questions.
- Keep portal credentials, signatures, payments, official forms, source files, and private property records outside the planner.
- Have the responsible reviewer confirm code, structural, electrical, fire-access, utility, and AHJ requirements.
Skip payment when
- You need an engineering design, PE stamp, permit submission, portal login, fee payment, or utility/AHJ contact.
- You need code interpretation, licensure verification, inspection readiness, construction authorization, or safety advice.
- You need guaranteed approval, interconnection, inspection, schedule, quote, payment, ranking, traffic, sales, or revenue.