Solar Plan Set Intake Checklist

Prepare the address, site plan, roof layout, one-line diagram inputs, labels, cut sheets, and utility details a drafter will ask for.

Run precheck Check paid fit after the precheck

Who this helps

teams that need a cleaner handoff before requesting residential solar drawings.

What to gather

  • Site plan notes
  • Roof layout inputs
  • Equipment cut sheets
  • Utility and service-panel details

Suggested workflow

Boundary

SolarPermitPrepAI is an intake and precheck workflow. It is not an engineering stamp, permit approval, electrical design service, or legal advice.

Packet quality checklist

  • Label every attachment clearly: site photos, roof notes, equipment cut sheets, utility bill, and panel photos.
  • Include the current project stage so the drafter knows whether this is sales intake, quote prep, or revision cleanup.
  • Use one source of truth for address, homeowner name, equipment models, and AHJ notes.

Professional review boundary

  • The checklist helps prepare a drawing request; it does not create stamped construction documents.
  • Local AHJ forms, utility interconnection rules, and electrical code requirements still need qualified review.
  • Confirm all assumptions before anyone submits drawings or orders materials.

Missing-item triggers

  • No site plan or roof layout sketch
  • Missing equipment cut sheets
  • Unclear utility or meter information
  • No panel photo or breaker information

Quote handoff review

Before paying for review, confirm the address, AHJ, utility, project scope, equipment models, attachment list, and open questions. The cleaner the packet, the easier it is for a qualified professional to price and route the next step.

When the $49 packet prep is worth it

Pay only after the free precheck has an address, AHJ, project scope, equipment notes, first document list, and a qualified reviewer who can make the official decisions. The $49 review is useful for missing-item, document-owner, field-verification, reviewer-question, and quote-handoff structure. Skip payment if you need an engineering design, PE stamp, permit submission, portal login, fee payment, utility or AHJ contact, code interpretation, licensure verification, inspection readiness, construction authorization, safety advice, or guaranteed approval, interconnection, inspection, schedule, quote, payment, ranking, traffic, sales, or revenue.

Does it create drawings?

No. It creates an intake checklist and quote request, not a stamped plan set.

What if details are missing?

The output calls out missing items so you can ask the homeowner, installer, or utility coordinator.