Solar Plan Set Turnaround Time Checklist

Prepare a realistic solar plan-set timing brief with intake readiness, review dependencies, missing files, revision risk, and target dates.

Run precheck Check paid fit after the precheck

Who this helps

sales and operations teams setting expectations before residential solar drafting begins.

What to gather

  • Requested delivery date
  • Intake-complete date
  • Known review dependencies
  • Revision and approval assumptions

Suggested workflow

Boundary

SolarPermitPrepAI is an intake and precheck workflow. It is not an engineering stamp, permit approval, electrical design service, or legal advice.

Packet quality checklist

  • Separate drafting turnaround from professional review, permit review, utility review, and construction scheduling.
  • State which missing items can pause work and who owns each one.
  • Update the timing brief when equipment, layout, or AHJ requirements change.

Professional review boundary

  • Turnaround estimates are planning notes, not guarantees of permit or utility approval.
  • SolarPermitPrepAI does not control drafter, engineer, AHJ, utility, or contractor schedules.
  • Use dates as conditional targets and confirm them with every responsible party.

Missing-item triggers

  • Intake package is incomplete
  • Structural or electrical review is required
  • AHJ turnaround is unknown
  • Equipment or layout may change

Quote handoff review

Before paying for review, confirm the address, AHJ, utility, project scope, equipment models, attachment list, and open questions. The cleaner the packet, the easier it is for a qualified professional to price and route the next step.

When the $49 packet prep is worth it

Pay only after the free precheck has an address, AHJ, project scope, equipment notes, first document list, and a qualified reviewer who can make the official decisions. The $49 review is useful for missing-item, document-owner, field-verification, reviewer-question, and quote-handoff structure. Skip payment if you need an engineering design, PE stamp, permit submission, portal login, fee payment, utility or AHJ contact, code interpretation, licensure verification, inspection readiness, construction authorization, safety advice, or guaranteed approval, interconnection, inspection, schedule, quote, payment, ranking, traffic, sales, or revenue.

Does the tool guarantee a delivery date?

No. It helps expose dependencies so the responsible team can set a realistic target.

Is permit review included in drafting time?

Usually it is a separate dependency and should be tracked separately.